CCNP TRAINING

COURSE OVERVIEW

WE OFFER

 

  • Instructor Led classroom based training
  • Hands on Training
  • Free study material
  • Lab Exercises
  • Unlimited lab access
  • 100 % passing guarantee
    or Free Re-training

COURSE INFORMATION

 

  • Fast Track
    Days: Monday-Friday
    Duration: 8 days
  • Slow Track
    Days: Saturday/Sunday Only
    Duration: 8 Weeks
Study Modes:
  • Classroom
  • Live Virtual

CCNP TRAINING

For More information call us on

0208 123 7574

COURSE INSIGHT

CCNP Certification Training course covers planning, implementation and troubleshooting of local and wide area enterprise networks. Students who wishes to follow the CCNP training us highly recommend them with at least one year of experience in networking field or having previously competed CCNA training. At the end of the training student will demonstrate the knowledge and skills that required in enterprise environment and can apply for the following roles such as system/network engineer, support engineer, network technician.

This instructional class is also principally expected to help applicants attain their CCNP certificate, which obliges a beforehand got CCNA certification. This instructional class will likewise profit understudies looking to assemble and learn their insight into how to outline and implement medium-size systems with 100 to 500 or more workstation, and as a step towards accomplishing the CCIE Routing & Switching accreditation.

Our Cisco lab involves full course of action of to a great degree latest supplies sensible for setting up the likelihood for the Cisco CCNA and CCNP exams we deliver one of the best professional training programs in the industry. Specialists with extensive experience in the field conduct the lessons on this subject. The curriculum fits perfectly with professional standards with the latest industry changes.

CCNP TRAINING COURSE OUTLINE

MODULE

  • Network resources needed for implementing EIGRP on a network
  • Create an EIGRP implementation plan, EIGRP verification plan
  • Configure EIGRP routing
  • Verify EIGRP solution was implemented, Use show and debug commands
  • Document results of EIGRP implementation and verification
  • Determine network resources needed for implementing OSPF on a network
  • Create an OSPF implementation plan, OSPF verification plan
  • Configure OSPF routing
  • Verify OSPF solution was implemented properly using show and debug commands
  • Document results of OSPF implementation and verification plan
  • Determine network resources needed for implementing eBGP on a network
  • Create an eBGP implementation plan
  • Create an eBGP verification plan
  • Configure eBGP routing
  • Verify eBGP solution was implemented properly using show and debug commands
  • Document results of eBGP implementation and verification plan
  • Determine network resources needed for implementing IPv6 on a network
  • Create an IPv6 implementation plan, IPv6 verification plan
  • Configure IPv6 routing
  • Configure IPv6 interoperation with IPv4
  • Verify IPv6 solution was implemented properly using show and debug commands
  • Document results of IPv6 implementation and verification plan
  • Create a redistribution implementation plan based upon the results of the redistribution analysis
  • Create a redistribution verification plan
  • Configure a redistribution solution
  • Verify that redistribution was implemented
  • Document results of a redistribution implementation and verification plan
  • Identify the differences between implementing an IPv4 and IPv6 redistribution solution
  • Create a Layer 3 path control implementation plan based upon the results of the redistribution analysis
  • Create a Layer 3 path control verification plan
  • Configure Layer 3 path control
  • Verify that a Layer 3 path control was implemented
  • Document results of a Layer 3 path control implementation and verification plan
  • Implement basic teleworker and branch services
  • Describe broadband technologies
  • Configure basic broadband connections
  • Describe basic VPN technologies
  • Configure GRE
  • Describe branch access technologies
  • Determine network resources needed for implementing a VLAN based solution on a network
  • Create a VLAN based implementation plan
  • Create a VLAN based verification plan
  • Configure switch-to-switch connectivity for the VLAN based solution
  • Configure loop prevention for the VLAN based solution
  • Configure Access Ports for the VLAN based solution
  • verify the VLAN based solution was implemented properly using show and debug commands
  • Document results of VLAN implementation and verification
  • Determine network resources needed for implementing a Security solution
  • Create a implementation plan for the Security solution
  • Create a verification plan for the Security solution
  • Configure port security features
  • Configure general switch security features
  • Configure private VLANs Configure VACL and PACL
  • Verify the Security based solution was implemented properly using show and debug commands
  • Document results of Security implementation and verification
  • Determine network resources needed for implementing a Switch based Layer 3 solution
  • Create an implementation plan for the Switch based Layer 3 solution
  • Create a verification plan for the Switch based Layer 3 solution
  • Configure routing interfaces Configure Layer 3 Security
  • Verify the Switch based Layer 3 solution was implemented properly using show and debug commands
  • Document results of Switch based Layer 3 implementation and verification
  • Implement a Wireless Extension of a Layer 2 solution
  • Implement a VoIP support solution
  • Implement video support solution
  • Determine network resources needed for implementing High Availability on a network
  • Create a High Availability implementation plan
  • Create a High Availability verification plan
  • Implement first hop redundancy protocols
  • Implement switch supervisor redundancy
  • Verify High Availability solution was implemented properly using show and debug commands
  • Document results of High Availability implementation and verification
  • Develop a plan to monitor and manage a network
  • Perform network monitoring using IOS tools
  • Perform routine IOS device maintenance
  • Isolate sub-optimal internetwork operation at the correctly defined OSI Model layer
  • Multi Protocol system networks
  • EIGRP
  • OSPF
  • eBGP
  • routing redistribution solution
  • a DHCP client and server solution
  • NAT
  • first hop redundancy protocols
  • IPv6 routing
  • IPv6 and IPv4 interoperability
  • switch-to-switch connectivity for the VLAN based solution
  • loop prevention for the VLAN based solution
  • Access Ports for the VLAN based solution
  • private VLANS
  • port security
  • general switch security
  • VACL and PACL
  • switch virtual interfaces (SVIs)
  • switch supervisor redundancy
  • switch support of advanced services (i.e., Wireless, VOIP and Video)
  • a VoIP support solution
  • a video support solution
  • Layer 3 Security
  • issues related to ACLs used to secure access to Cisco routers
  • configuration issues related to accessing the AAA server for authentication purposes
  • security issues related to IOS services (i.e.,finger, NTP, HTTP, FTP, RCP etc.)

LOOKING FOR A
2-12 MONTHS
TRAINING?

CHOOSE

CCNP TRAINING

SKILLS GAINED

  • Troubleshoot
  • EIGRP based solution, network design and a set of requirements
  • Multi-area OSPF Network, given a network design and a set of requirements
  • eBGP based solution, given a network design and a set of requirements
  • Layer 3 Path Control Solution
  • Implement VLAN based solution, given a network design and a set of requirements
  • Implement a Security Extension of a Layer 2 solution, given a network design and a set of requirements
  • Implement Switch based Layer 3 services, given a network design and a set of requirements
  • Prepare infrastructure to support advanced services
  • Maintain and monitor network performance

Dates And Prices

Start Date TimingDaysDuration Mode Of TrainingRequest Price/Future Dates
18.03.2024
10:00 – 18:00Mon - Fri 5 DaysClassroom Based / Live Virtual Online
25.03.2024
10:00 – 18:00Mon - Fri 5 DaysClassroom Based / Live Virtual Online
27.03.202410:00 – 18:00Wed only 5 Weeks Classroom Based / Live Virtual Online
15.04.202410:00 – 18:00Mon - Fri 5 DaysClassroom Based / Live Virtual Online
17.04.202410:00 – 18:00Wed only 5 Weeks Classroom Based / Live Virtual Online
22.04.202410:00 – 18:00Mon - Fri 5 DaysClassroom Based / Live Virtual Online
29.04.202410:00 – 18:00Mon - Fri 5 DaysClassroom Based / Live Virtual Online
01.05.202410:00 – 18:00Wed only 5 Weeks Classroom Based / Live Virtual Online
06.05.202410:00 – 18:00Mon - Fri 5 DaysClassroom Based / Live Virtual Online
13.05.202410:00 – 18:00Mon - Fri 5 DaysClassroom Based / Live Virtual Online
15.05.202410:00 – 18:00Wed only 5 Weeks Classroom Based / Live Virtual Online
20.05.202410:00 – 18:00Mon - Fri 5 DaysClassroom Based / Live Virtual Online
27.05.202410:00 – 18:00Mon - Fri 5 DaysClassroom Based / Live Virtual Online
29.05.202410:00 – 18:00Wed only 5 Weeks Classroom Based / Live Virtual Online
03.06.202410:00 – 18:00Mon - Fri 5 DaysClassroom Based / Live Virtual Online
10.06.202410:00 – 18:00Mon - Fri 5 DaysClassroom Based / Live Virtual Online
12.06.202410:00 – 18:00Wed only 5 Weeks Classroom Based / Live Virtual Online
17.06.202410:00 – 18:00Mon - Fri 5 DaysClassroom Based / Live Virtual Online
24.06.202410:00 – 18:00Mon - Fri 5 DaysClassroom Based / Live Virtual Online
26.06.202410:00 – 18:00Wed only 5 Weeks Classroom Based / Live Virtual Online
01.07.202410:00 – 18:00Mon - Fri 5 DaysClassroom Based / Live Virtual Online
08.07.202410:00 – 18:00Mon - Fri 5 DaysClassroom Based / Live Virtual Online
10.07.202410:00 – 18:00Wed only 5 Weeks Classroom Based / Live Virtual Online
15.07.202410:00 – 18:00Mon - Fri 5 DaysClassroom Based / Live Virtual Online
22.07.202410:00 – 18:00Mon - Fri 5 DaysClassroom Based / Live Virtual Online
24.07.202410:00 – 18:00Wed only 5 Weeks Classroom Based / Live Virtual Online
29.07.202410:00 – 18:00Mon - Fri 5 DaysClassroom Based / Live Virtual Online
05.08.202410:00 – 18:00Mon - Fri 5 DaysClassroom Based / Live Virtual Online
07.08.202410:00 – 18:00Wed only 5 Weeks Classroom Based / Live Virtual Online
12.08.202410:00 – 18:00Mon - Fri 5 DaysClassroom Based / Live Virtual Online
19.08.202410:00 – 18:00Mon - Fri 5 DaysClassroom Based / Live Virtual Online
21.08.202410:00 – 18:00Wed only 5 Weeks Classroom Based / Live Virtual Online
26.08.202410:00 – 18:00Mon - Fri 5 DaysClassroom Based / Live Virtual Online
02.09.202410:00 – 18:00Mon - Fri 5 DaysClassroom Based / Live Virtual Online
04.09.202410:00 – 18:00Wed only 5 Weeks Classroom Based / Live Virtual Online
09.09.202410:00 – 18:00Mon - Fri 5 DaysClassroom Based / Live Virtual Online
16.09.202410:00 – 18:00Mon - Fri 5 DaysClassroom Based / Live Virtual Online
18.09.202410:00 – 18:00Wed only 5 Weeks Classroom Based / Live Virtual Online
23.09.202410:00 – 18:00Mon - Fri 5 DaysClassroom Based / Live Virtual Online
30.09.202410:00 – 18:00Mon - Fri 5 DaysClassroom Based / Live Virtual Online

RELATED COURSES

SAP HCM

Company that offers design and build services for you from initial sketches to the final production.

read more

SAP Training

Our aim is exclusively focused on high quality training that are tailored to corporate needs. The training delivered by professional trainers.

read more

SAP FCO

Our internship programme is designed to help students who have successfully completed the training and give experience in real time projects.

read more

SAP FCO

Our internship programme is designed to help students who have successfully completed the training and give experience in real time projects.

read more